for Proposed Construction of the Gamsberg Zinc Mine

Environmental and Social Impact Assessment for Proposed Construction of the Gamsberg Zinc Mine and Associated Infrastructure near Aggeneys, Northern Cape Province: Notification of Final Scoping Report for public comment

DENC EIA Reference Number: NC/EIA/NAM/KHAI/AGG/2012-NCP/EIA/0000155/2012
DEA Reference Number: 12/9/11/L955/8
DENC AEL Reference Number: NC/AEL/NAM/BMM01/2012
DMR Reference Number: NCS 30/5/1/2/2/1/518

Our sincere thanks to all that that provided comments on the Draft Scoping Report and took part in the public participation meetings held in November 2012. The comment period for the Draft Scoping Report came to an end on the 14 December 2012 and. All comments that have been raised to date have been recorded in the Comment and Response Report.

Based on comment received and further interaction with the specialist team, the Draft Scoping Report has been finalised. The purpose of this letter is to inform you of the availability of the Final Scoping Report (FSR) for a 21 day public review. The FSR is available for public comment from the 14 January 2013 to 04 February 2013.

FSR available for public comment
The FSR is released for a 21 day public comment period and will be available at the following public locations:

Public place Contact details
Pofadder Public Library 054 933 0221
Pofadder Local Municipal Offices 054 933 1000
Springbok municipal offices 027 712 8000
Springbok Library 027 718 8136
Aggeneys Public Library 054 983 2760
Pella Public Library 082 793 5548
Pella Local Municipality 054 971 0062

DRAFT SCOPING REPORT

Draft Scoping Report
Annexures

FINAL SCOPING REPORT

Final Scoping Report with annexures (5Mb PDF)

DRAFT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

Cover, Non-technical, toc glossary list of acronyms
Chapter 1: Introduction
Chapter 2: Administrative Framework
Chapter 3: Project Description
Chapter 4: Summary of Alternatives
Chapter 5: Biophysical Receiving Environment
Chapter 6: Socio-Economic Receiving Environment
Chapter 7: Stakeholder Engagement (Public Participation)
Chapter 8: Waste Management and Classification
Chapter 9: Biophysical Impact Assessment
Chapter 10: Socio-economic Impact Assessment
Chapter 11: Cumulative Impact Assessment
Chapter 12: Closure and post mining landuse
Chapter 13: Summary of Biodiversity offsetting process
Chapter 14: Conclusion
Reference List

ANNEXURES

Annexure A: Legislative Framework
Annexure B: Project Facilities and Infrastructure
Annexure C: Stakeholder Database
Annexure D: Environmental Management
Annexure E: Public Participation Document
Annexure F: Biodiversity Offset Report
Annexure G1 – Air Quality Assessment
Annexure G2 – Hydrogeological Assessment
Annexure G3 – Geochemical Assessment
Annexure G4 – Faunal Assessment
Annexure G5 – Botanical Assessment
Annexure G6 – General Ecological Assessment
Annexure G7 – Hydrological Assessment (Part 1)
Annexure G7 – Hydrological Assessment (Part 2)
Annexure G7 – Hydrological Assessment (Part 3)
Annexure G7 – Hydrological Assessment (Part 4)
Annexure G8 – Noise and Vibration Assessment
Annexure G9 – Climate Change Assessment
Annexure G10 – Economic Assessment
Annexure G11 - Visual Assessment
Annexure G12 – Traffic and Transportation Assessment
Annexure G13 – Heritage and Archaeological Assessment
Annexure G14- Paleontological Assessment
Annexure G15 – Waste

FINAL ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

Cover, Non-technical, toc glossary list of acronyms
Chapter 1: Introduction
Chapter 2: Administrative Framework
Chapter 3: Project Description
Chapter 4: Summary of Alternatives
Chapter 5: Biophysical Receiving Environment
Chapter 6: Socio-Economic Receiving Environment
Chapter 7: Stakeholder Engagement (Public Participation)
Chapter 8: Waste Management and Classification
Chapter 9: Biophysical Impact Assessment
Chapter 10: Socio-economic Impact Assessment
Chapter 11: Cumulative Impact Assessment
Chapter 12: Closure and post mining landuse
Chapter 13: Summary of Biodiversity offsetting process
Chapter 14: Conclusion

ANNEXURES

Annexure - A1 EIA Application Final
Annexure - A2 WML Application Form V101
Annexure - A3 AEL Application V101
Annexure - A4 - Legislative Framework
Annexure B: Project Facilities and Infrastructure
Annexure C: Stakeholder Database
Annexure D: Environmental Management
Annexure E: Public Participation Document
Annexure F: Biodiversity Offset Report
Annexure G1 – Air Quality Assessment
Annexure G2 – Hydrogeological Assessment
Annexure G3 – Geochemical Assessment
Annexure G4 – Faunal Assessment
Annexure G5 – Botanical Assessment
Annexure G6 – General Ecological Assessment
Annexure G7 – Hydrological Assessment
Annexure G8 – Noise and Vibration Assessment
Annexure G9 – Climate Change Assessment
Annexure G10 – Economic Assessment
Annexure G11- Visual Assessment
Annexure G12 – Traffic and Transportation Assessment
Annexure G13 – Heritage and Archaeological Assessment
Annexure G14- Paleontological Assessment
Annexure G15 – Waste

ENVIRONMENTAL AUTHORISATIONS

Environmental Authorisation for WML
Gamsberg Environmental Authorisation from denc

Public Participation and Comments

Tougheeda Aspeling
ERM

Postnet Suite 90, Private Bag X12
Tokai, 7966  

Tel: 021 681 5400
Fax: 0865404072
E-mail: gamsberg@erm.com