Gold Fields in collaboration with Enel Green Power (EGP) is proposing  to  develop 2x20 MW Solar PV plants at their South Deep Gold mine near Westonaria, Gauteng. EGP will build, own and operate the solar plant.

The proposed plants will be located on Mine owned property within the Goldfields South Deep Mining Right in Westonaria, Gauteng, South Africa. The Solar PV Plant will be connected to the mines 11kV power grid.

The Project requires Environmental Authorisation (EA) from the National Department of Mineral Resources (DMR) under the National Environmental Management Act (NEMA) (Act No. 107 of 1998), through an Environmental Impact Assessment (EIA) process.

This website serves to disseminate Project information as it becomes available. If you have any questions, or wish to register as an interested and affected party, please contact ERM.

The Background Information Document is available for download below.

South Deep Solar Draft BID_May2017.pdf

The Draft Scoping Report is available for download below.

South Deep Solar DSR FINAL.pdf

South Deep Solar DSR Annexes FINAL.pdf

ERM Contact

Alan Cochran
Email: southdeepsolar.eia@erm.com 
Tel: +27 11 798 4300